Tasks & Work Packages
Decompose a plan into parallel-safe work packages (WPs) with subtasks, dependencies, and deliverables.
What It Does
The tasks phase:
- Analyzes the plan to identify groupings and dependencies
- Creates work packages — self-contained units of work
- Defines dependencies — which WPs must complete before others
- Generates subtasks — concrete checklist items per WP
- Specifies deliverables — files and artifacts to produce
- Creates WP prompt files — instructions for implementation
Quick Usage
agileplus tasks 001Output:
Decomposing plan into work packages...
✓ Created WP01-database (depends on: none)
✓ Created WP02-models (depends on: WP01)
✓ Created WP03-sendgrid (depends on: WP02)
✓ Created WP04-queue (depends on: WP02, WP03)
✓ Created WP05-handlers (depends on: WP04)
✓ Created WP06-api (depends on: WP02)
✓ Created WP07-tests (depends on: WP05, WP06)
Generated:
kitty-specs/001-email-notifications/tasks/
├── WP01-database.md
├── WP02-models.md
├── WP03-sendgrid.md
├── WP04-queue.md
├── WP05-handlers.md
├── WP06-api.md
└── WP07-tests.md
Ready to implement:
agileplus implement WP01Work Package Structure
Each WP file contains:
# WP01: Database Schema & Migrations
## Overview
Create the database tables needed for email support: email queue, preferences, templates.
## Subtasks
- [ ] Create migration up: 001_email_schema.sql
- [ ] Define email table with proper indexes
- [ ] Define email_preferences table with constraints
- [ ] Define email_template table
- [ ] Create migration down (for rollback)
- [ ] Test migration up/down in isolation
- [ ] Document schema design rationale
## Dependencies
None. This work package can start immediately.
## Deliverables
### Files to Create
- `src/db/migrations/001_email_schema.sql` (up migration)
- `src/db/migrations/001_email_schema.down.sql` (down migration)
### Files to Modify
None
### No Files to Delete
## Definition of Done
- [ ] All subtasks completed
- [ ] Migration runs without errors
- [ ] Migration can be reverted cleanly
- [ ] Tables have proper constraints and indexes
- [ ] Tests pass
## Acceptance Criteria
- Email table exists with all required columns
- Indexes created on frequently queried columns (user_id, status)
- Foreign key constraints defined
- Both up and down migrations work
## Estimated Effort
2-3 hours
## Lane
planned → doing → for_review → doneExample: Complete Work Package
---
spec: 001-email-notifications
wp_id: WP02
title: Email Data Models
estimated_hours: 4
---
# WP02: Email Data Models
## Overview
Create Rust data structures for Email, EmailPreference, and EmailTemplate entities.
These models will be used throughout the system for database operations and API contracts.
**Depends on**: WP01 (database schema must exist)
**Enables**: WP03, WP04, WP06 (all depend on these models)
## Requirements from Spec
From spec 001, these models must support:
- Sending different email types (welcome, mention, receipt)
- Tracking email status (pending, sent, failed, bounced)
- Retrying failed emails with attempt tracking
- User preference management per email category
- Template customization and rendering
## Subtasks
- [ ] Create Email struct with all required fields
- id, user_id, event_type, recipient
- subject, body, status
- attempts, retry_at, last_error
- created_at, sent_at, bounced_at
- [ ] Implement EmailStatus enum
- Pending, Sent, Failed, Bounced
- Implement Display and serde traits
- [ ] Create EmailPreference struct
- user_id, category (marketing/transactional/account)
- enabled (boolean)
- unsubscribe_token for links
- [ ] Create EmailTemplate struct
- id, event_type, subject, body_template
- version tracking for templates
- [ ] Implement FromRow trait for sqlx
- Custom deserialization from database rows
- [ ] Add validation methods
- validate_email() — valid email addresses
- validate_preference_category() — valid categories
- [ ] Write unit tests for models
- Test serialization/deserialization
- Test validation logic
- Test enum conversions
- [ ] Document model fields and purpose
## Deliverables
### Files to Create
- `src/models/email.rs` (~150 lines)
- Email struct with all fields
- EmailStatus enum with FromRow impl
- Validation methods
- `src/models/email_preference.rs` (~100 lines)
- EmailPreference struct
- Category validation
- `src/models/email_template.rs` (~80 lines)
- EmailTemplate struct
- Template field validation
### Files to Modify
- `src/models/mod.rs` — Add exports for new models
- Add: `pub mod email;`
- Add: `pub use email::{Email, EmailStatus};`
### No Files to Delete
## Definition of Done
- [ ] All subtasks completed
- [ ] Code compiles without warnings
- [ ] All unit tests pass
- [ ] Models have appropriate derives (Serialize, Deserialize, Clone, Debug)
- [ ] Code follows project conventions (naming, style, comments)
- [ ] Models properly implement sqlx::FromRow for database mapping
- [ ] Validation methods are tested
- [ ] Documentation complete (doc comments on public items)
## Acceptance Criteria
- **Completeness**: All email-related models defined
- **Correctness**: Models match database schema from WP01
- **Quality**: No compiler warnings, tests pass
- **Documentation**: Each public item has doc comments
- **Integration**: Models can be imported and used in other modules
## Estimated Effort
3-4 hours
## Implementation Notes
**Pattern**: Follow existing model pattern in codebase
- Look at `src/models/user.rs` for style
- Use same derive macros
- Same error handling approach
**Testing**: Create comprehensive unit tests
- Test Email creation and status transitions
- Test EmailPreference category validation
- Test serialization with serde
**Database Mapping**: Implement custom sqlx::FromRow
- Handle status enum conversion from string
- Handle datetime fields properly (created_at, sent_at)
## Related Work Packages
- **Depends on**: WP01 (database must be created first)
- **Unblocks**: WP03, WP04, WP06 (all use these models)
## Lane
planned → doing → for_review → doneDependency Graph
Work packages form a dependency DAG (directed acyclic graph):
Rules:
- WP01 can start immediately (no dependencies)
- WP02 can start once WP01 is done
- WP03, WP04, WP06 can run in parallel (once WP02 done)
- WP05 waits for WP04
- WP07 waits for both WP05 and WP06
Kanban Lanes
Work packages flow through these states:
planned
↓ (when dependencies met)
doing
↓ (when implementation complete)
for_review
↓ (when reviewer approves)
done
↓
(unblocks dependent WPs)| Lane | Meaning | Who Actions | Notes |
|---|---|---|---|
planned | Ready to implement (deps met) | Implementer | Can start implementing |
doing | Currently being implemented | Implementer | Work in progress |
for_review | Ready for code review | Reviewer | All subtasks done, code written |
done | Approved and merged | Team | Unblocks dependent WPs |
Work Package Sizing
Good WP sizing is critical for parallel work:
Target size: 1-4 hours of work
Too large (>4 hours):
❌ "WP01: Entire feature"
- Single implementer blocked for days
- Hard to review
- Can't parallelize
✓ Split into smaller WPsToo small (<30 minutes):
❌ "WP01: Import module"
- Overhead of code review > actual work
- Trivial to implement
✓ Combine with related workJust right:
✓ WP01: Database schema (2 hours)
✓ WP02: Models (3 hours)
✓ WP03: API integration (3 hours)Creating Effective Subtasks
Each subtask should be:
Specific and actionable:
❌ "Create email service"
✓ "Create SendGrid HTTP client with authentication"Testable:
❌ "Handle errors"
✓ "Add retry logic: exponential backoff, 5 attempts over 72 hours"Completable within an hour:
❌ "Implement entire email system"
✓ "Create Email struct with sqlx FromRow implementation"Measurable:
❌ "Make it fast"
✓ "Reduce email send latency to <5ms via caching"Parallel Work Strategies
1. No Dependencies
If WPs have no dependencies, start them all in parallel:
WP01 (0 deps) ─┐
WP02 (0 deps) ─┼→ All parallel
WP03 (0 deps) ─┘2. Sequential Dependencies
If chain is linear, only one implementer needed:
WP01 → WP02 → WP03 → WP04
(2h) (3h) (2h) (3h)
= 10 hours sequential
= 10 hours with 1 person
= ~3 hours with 4 people (optimal)3. Fan-Out Dependencies
When one WP unblocks many:
WP01 (foundation)
├─ WP02
├─ WP03
├─ WP04
└─ WP05
(can parallelize WP02-05 after WP01)4. Complex DAG
When dependencies are non-trivial:
# Visualize dependencies
agileplus show 001 --dependency-graph
# See which WPs can run now
agileplus queue list --ready-now
# See what unblocks
agileplus show WP03 --will-unblockPrompt Files
Each WP gets a prompt file for agent dispatch:
# WP02: Email Data Models
You are implementing work package WP02 for feature 001.
## Context
- Spec: `kitty-specs/001-email-notifications/spec.md`
- Plan: `kitty-specs/001-email-notifications/plan.md`
- Related WPs: WP01 (completed), WP03 (waiting on you)
## Your Task
Implement the Email, EmailPreference, and EmailTemplate data models.
## Deliverables
- `src/models/email.rs`
- `src/models/email_preference.rs`
- `src/models/email_template.rs`
## Subtasks
1. Create Email struct matching database schema
2. Implement EmailStatus enum
3. Add sqlx FromRow implementations
4. Write unit tests
5. Verify integration with database
## Definition of Done
- All subtasks completed
- Code compiles without warnings
- All tests pass
- Models match database schema from WP01
## Files Changed
- src/models/email.rs (CREATE)
- src/models/email_preference.rs (CREATE)
- src/models/email_template.rs (CREATE)
- src/models/mod.rs (MODIFY - add exports)
## Command to Start
agileplus implement WP02Tips for Good Work Packages
1. Clear boundaries
Each WP owns specific files and deliverables with no overlap.
2. Self-documenting
Prompt file clearly states what to build and acceptance criteria.
3. Testable completion
Clear definition of done — someone can verify completion objectively.
4. Balanced sizing
Roughly 2-4 hours per WP across the feature.
5. Logical grouping
Related code together (database + models, not database + UI).
Next Steps
After creating work packages:
# Start implementing
agileplus implement WP01
# In parallel, other WPs ready for work
agileplus implement WP02
# Track progress
agileplus show 001 --dependency-graphThen move to review:
agileplus move WP01 --to for_review
agileplus review WP01
agileplus move WP01 --to done
# ^ WP02 unblocks nowRelated Documentation